FirstSpec

Powered by Powerflex
STEP 1 OF 5
Project Setup

Place Your Water Source
Tap the map to place a well or tie-in. This is the starting point for your water line.
Wells / Tie-Ins0
📐
Draw Water Lines
Draw the main line from your well. Use the Tee tool to split the line. Add branches for secondary runs. Tap "Add Watering Point" when lines are complete.
Main line
Branch line
Line tee (split)
Main line0 ft
Branch line0 ft
Elbows detected0
💧
Add Watering Points
Tap along your lines to place watering point markers — both mid-line and at line ends.
Watering Points0
Review & Edit
All drawing tools are available. Make any corrections, then calculate materials.
Your layout is ready!
Enter your details and we'll get your estimate to our team — then your material cart will open automatically.

Well #1 — PVC Connection
What size PVC pipe is coming from the well pump?
One more thing before your cart opens
Would you like to receive installation quotes from certified installers in your area?
Save Project
Project will be saved to the dashboard and can be reloaded, edited, and emailed.

Load Project
Select a previously saved project to resume editing.